Description:
Butler Heavy Structures designed and supplied the structural steel and cladding systems for this 57,400 sq. ft. paint facility for the Air Force.
The framing system consists of flat-bottom trusses supported on single shaft columns. The two trusses above the hangar doors are 5' deeper than the rest of the building to house a fully lined plenum space to control airflow. The structural steel was also designed to support two (2) 60-ton hydraulic cranes used to paint the aircraft.
The two-story shop and mechanical building, at the rear of the facility, houses four large air units that force air flow over the aircraft into the exhaust plenum above the hangar doors, where additional air units are housed. The building is clad with an MR-24® standing seam roof and Butlerib® II wall panels that are manufactured by Butler.
Butler Builder®: Hightower Construction Co., Inc.