Project Profile
Newington Energy
Newington, NH
End Use:
Power Generation
Client:
Duke Fluor/Daniel & Newington Energy, LLC
Size:
Turbine Building: 75'x314'x80' Clear Hgt.
Description:
This 60,000 sq. ft. multi-unit combined cycle complex includes a 40,000 sq. ft. Turbine building that houses two gas turbine generators and one steam turbine generator in one facility. Butler Heavy Structures provided a hybrid structural steel framing system that incorporated both conventional and pre-engineered components for the buildings. To accommodate strict sound transmission requirements, a special acoustical wall panel was supplied as part of the builder’s package.
Welded-up, step-crane columns were used in the Gas and Steam Turbine building to support a 70-ton top running crane that traverses the 314' length of the building. Framing for this section of the complex was complicated by a 50' roof step and heavy support framing for two large filter house units.
Butler’s MR-24® standing seam roof system was used on all of the units.
Download Project Profile:
HS139 NEWINGTON E... (187.1 kb)