Dearborn Industrial Generation

Project Details

Dearborn, Michigan
80,500 square feet

Structural System: Butler Heavy Structures
Roof System: Other
Wall System: Butlerib® II wall system
End Use: Manufacturing and Industrial

This 80,500 sq. ft. multi-unit complex was built on a fast-track schedule to replace a previous facility destroyed in an explosion. Butler Heavy Structures provided the structural steel and cladding systems for all units, except the Boiler House. Welded-up, step-crane columns were used in both the Gas and Steam Turbine buildings to support a 65-ton and 85-ton crane, respectively.

Framing for the Gas Turbine building was complicated by a 35' roof step and support framing for the large air intake units. A standing seam metal roof system and metal wall panel system was used on all of the units, including the 100' tall Boiler House which was designed and supplied by others.

Dearborn 3
Dearborn 2