Newington Energy

Power

Client:
Duke Fluor/Daniel & Liberty Electric Power, LLC
End Use:
Power Generation
Project Location:
Newington, NH
Square Footage:
60,000
Description:

This 60,000 sq. ft. multi-unit combined cycle complex includes a 40,000 sq. ft. Turbine building that houses two gas turbine generators and one steam turbine generator in one facility. Heavy Structures provided a hybrid structural steel framing system that incorporated both conventional and pre-engineered components for the buildings. To accommodate strict sound transmission requirements, a special acoustical wall panel was supplied as part of the builder’s package. Welded-up, step-crane columns were used in the Gas and Steam Turbine building to support a 70-ton top running crane that traverses the 314' length of the building. Framing for this section of the complex was complicated by a 50' roof step and heavy support framing for two large filter house units. A standing seam metal roof system was used on all of the units.

Newington Energy
Newington Energy
Newington Energy
Download Project Profile HS139 Newington Profile.pdf (630 KB)